During 2005 and 2006, Action Engineering Limited designed, manufactured and installed the five pump stations and the Waireka Valley Discharge Structure, which formed the initial distribution network for pumped water on the North Otago Irrigation Scheme.
THE CAPABILITY
Pump installation
Pumps ranged in size from 75kW to 200kW, and the total installed capacity over the 5 stations was over 3.5 megawatts.Galvanised pipework
Large diameter galvanized steel pipework and supporting structures were fabricated in our Dunedin workshop, and delivered to site for installation by our site team.Site installation
Our team installed pumps, pipework, pipe supports and vacuum priming systems for the five pump stations.