Musselburgh pump station. Expertly delivered. Reliably installed.

This project involved pipework and connection upgrades to the wastewater network at and around the Musselburgh Pump Station. In conjunction with McConnell Dowell, our team constructed and installed new diversion pipework from dry weather pumps 1 and 2. Outside the station, the teams trenched down the road to connect to the existing pipework downstream of the damaged manifold. This project was completed in July 2024.

THE CAPABILITY

  1. Workshop pipework fabrication
    Pipe spools were fabricated in our workshop from the project's design models, ready for delivery to the coating application team

  2. Diversion pipework installation
    Working alongside McConnell Dowell, our team installed new pipework internally and externally to connect with the existing discharge pipework.

  3. Documentation
    Using 3D scanning and CAD software, our team ensured all components fitted within the existing pump station. Full QA documentation was prepared for materials, welding, testing and coatings.